Marzocco linea manual


















Check Drain System for Leaks and Clogs. Check Brew Temp and Flowrate. Check that Brew Pressure is at 9 Bar. Check All Switches for Proper Operation. Check Shot Volumes. Espresso EP. New Steam.

Steam pre TB New Accessory Kits. TB Solenoid Fuses. TB New Diffuser Screw. TB New Safety Thermostat. TB New Check Valve. TB New Swift Hopper. TB New Shower Screen. TB TL TB Linea PB steam knob. TB New Vulcano Hoppers.

TB Barista Light Kits. Mazzer TB Grid mesh. TB Flow Restrictor Guide. TB New Filter Baskets. TB Support for Strada Potentiometer. The programming of the individual parameters is possible only using the buttons in the group 1 group starting from the left. This button is used to control the brewing of the single espresso. This button is used to control the brewing of the double espresso.

For simplicity's sake in this manual it will be represented by this symbol with the name T2. This button is used for a continuous control of the brewing of the espresso. For simplicity's sake in this manual it will be represented by this symbol with the name T1. The rectangles next to CB and SB indicate the warming up of the water contained in the boilers.

When the set. Now the machine. During the normal operation of the machine, the flashing of the rectangles indicates the. NOTE: Ensure all air is removed from the group prior to staring the espresso machine. This only needs to be completed once during the initial setup or when water is drained from the coffee boiler.

Instructions for bleeding the groups of air can be found in the Installation Guide. To complete the start up process, press any button. The screen shown to the left will be displayed. During servicing or other conditions that warrant it, the main switch should be turned to the 0 position. The espresso machine is off and display should be blank. It is important to follow this procedure when turning.

To program the brewing amount for each button, to set the coffee. T3 button to confirm the exit, or press at the same time the buttons T2 and T3.

Enter the password and press the buttons T1. Note: You must scroll to the exit menu to exit the programming mode, or press at the same time the buttons. There are about 10 preset cycles with an interval of 4 seconds. To manually stop the rinsing, press any key. NOTE: In order to properly rinse the groups, put a small amount of detergent in a blind portafilter basket and insert it in the group to be rinsed before activating the rinsing process. Most detergents cause foaming during the cleaning process.

This foam collects at the. The procedure for weighing the filter holder either empty or filled with coffee powder is shown below.

When the value is no longer flashing, place the empty filter holder on the appropriate seat of the grid as. When the value is no longer flashing, place the filter holder filled with coffee powder on the appropriate seat of. This number refers to the number of pulses that the flowmeter sends to the CPU.

To program the coffee brewing time, press the dose button to start and then press it again to stop, once the. Successful programming is indicated by the lighting of the button. This operation must. The buttons can be programmed in any sequence. On each button you can set two doses, one for a short shot, one for a long shot. To set the brewing time of a short shot, press and release the button immediately, press again to stop and store.

To set the brewing time of a long shot, press and hold the button for about 2 seconds, press and release the. If one of the two doses is not set or does not refer to the corresponding dose of the first group, it will work as continuous dose. To set the brewing weight of a short shot, press and release the button immediately, press again to stop and store. To set the brewing weight of a long shot, press and hold the button for about 2 seconds, press and release the.

Welcome to ManualMachine. We have sent a verification link to to complete your registration. Log In Sign Up. Forgot password? Enter your email address and check your inbox. Please check your email for further instructions.

Enter a new password. La Marzocco. Linea PB. General Warnings and Safety Specifications 2. Definition of Available Models 3. Installation 4. Machine Operation and Coffee Preparation 5. Dispensing Steam and Hot Water 6. Maintenance and Periodic Cleaning Operations 7. De-commissioning and Demolition 8. Mandatory Maintenance and Check-up Operations 9. Precision Scale Software Programming Guide certifications available:. La Marzocco S. This machine should not be installed in kitchens.

Any repairs must be performed exclusively by 4. The following is a list of effective volumes and power ratings according to the number of groups installed: 2 groups 7 liters 3 groups 11 liters 4 groups 15 liters Covers are welded at either end of the cylindrical tank and on one of them there is a housing for the water heating element, which allows the steam boiler to reach operating pressure within approximately 25 minutes.

Operating pressure is maintained 6. The following, table is a list of effective volumes and power ratings according to the number of groups installed: 2 groups 3.

The brewing group. TO 4,7 in. The internal electronics will switch the pump motor on when needed. Water specifications table Min. When brewing, the pressure should be set to 9 bar. IMPORTANT To improve the flavor of the espresso, the temperatureofthewaterinthecoffeeboiler and therefore of the groups may eventually be raised or lowered via the digital display please consult the Software Programming Manual for detailed instructions.

You can then from being sucked back into the steam pour this milk into a cup containing warm boiler it is recommended before using espresso and you will end up with a fresh the wand that you purge the steam valve cup of cappuccino. Failure to do so can cause the heated liquid to transfer from the heated liquid container to the steam boiler via vacuum created from cooling parts.

Page 82 5. In Maschinen mit 4 Gruppen befindet er sich auf der rechten und linken Seite. La Marzocco wenden, enrico lamarzocco. Page 84 6. Page 85 7. Page 87 8. Page 88 9. Diese periodischen Wartungseingriffe sind nicht durch die Garantie abgedeckt. Page 91 1. Advertencias generales y normas de seguridad poliestirol, etc. Page 93 2. AV y Mod. Cubierta construyen en diferentes versiones con 1, 2, 3 constantes.

Page 96 3. Page 99 4. Page sumergida en la caldera. Page la taza. Page 5. Page 6. Page 7. Page 8. Page 9. This manual is also suitable for: Fb Print page 1 Print document pages. Rename the bookmark. Delete bookmark?



0コメント

  • 1000 / 1000